Here's a moment I see all the time: a buyer gets the "your offer was accepted!" call, celebrates, and then asks, "So what happens now?" In Arizona, the answer is a short, important stretch of time where you get to look under the hood. Handle it well and you buy with confidence. Rush it and you can end up with surprises after closing. Let me walk you through it, step by step.

Day One: The Clock Is Already Running

Your inspection period starts when the contract is accepted. The length is set in your purchase contract (and you can negotiate it in your offer), so the first thing I do with my buyers is put the deadline on the calendar. The second thing is calling inspectors. Good inspectors book up, and every day you wait is a day you lose.

The First Few Days: Inspect Everything You Care About

A general home inspection is a must. From there, it depends on the home:

  • A termite inspection, which is standard practice for Arizona buyers.
  • A pool specialist, if there's a pool or spa.
  • A roofer, especially for tile roofs or older homes.
  • An HVAC tech to check the A/C you'll be relying on all summer.
  • A sewer camera scope on older properties.

This is also the time to review HOA documents, get insurance quotes and check anything about the area that matters to your family. Buying a brand-new home? Read why you should bring your own agent when touring model homes; independent inspections are smart on new builds too.

Still picking an inspector? Read my guide on how to choose a home inspector in Arizona: how to check state certification, what to ask about insurance, and the questions I ask about roofs, pools and sewer lines.

If the seller offers a home warranty plan, or the home is new enough to have builder coverage left, my guide to builder warranties vs home warranty plans in Arizona explains how each one works.

The seller's disclosure form arrives during this same window. My guide to reading the Arizona Seller Property Disclosure Statement covers what it tells you, what it does not, and the deadlines that come with it.

Before the Deadline: Decide and Send the BINSR

Once the reports are in, we sit down together and sort the findings into three piles: must-fix, nice-to-fix and ignore. Then you choose your path on the Buyer's Inspection Notice and Seller's Response, which everyone calls the BINSR:

  • Move forward as-is if you're comfortable with what you found.
  • Request repairs or a credit for the items that matter.
  • Cancel if the home isn't right for you.

The key is getting that BINSR delivered before your inspection period ends. Missing the deadline can cost you leverage, the right to cancel for inspection reasons, and possibly your earnest money.

After You Send It: The Seller's Turn

When you ask for repairs or a credit, the Arizona contract gives the seller five days to respond. They might say yes to everything, say no, or meet you partway. If they don't agree to it all, you get a short window under the contract to accept their answer or walk away. This back-and-forth is where negotiating skill pays off. I cover more of that in Negotiating a Home Purchase in Arizona: More Than Just the Price.

What You Are Signing on the BINSR Form

The BINSR is a three-page Arizona REALTORS® form, and the top of it is a list of acknowledgments, not a list of repairs. By signing, the buyer acknowledges that all desired inspection period inspections and investigations are done before the notice is delivered, that all disapproved inspection period items are in this notice, that the buyer's election is limited to the options on the form, and that the buyer is not entitled to change the election after delivering it. The resale contract says the same thing: all inspection period items disapproved go in a single notice.

That is why I do not send a BINSR until the last report is in. A sewer scope that comes back the day after you deliver the notice cannot be added.

How I Word the Items

Vague items lead to vague repairs. "Fix roof" invites the cheapest patch. I write each item so a stranger could tell whether it was done:

  • What the problem is and where, tied to the inspector's report page
  • What the buyer wants: repair by a licensed contractor, replacement, further evaluation or a credit
  • What proof the buyer wants back, such as an invoice or a written evaluation

The form reminds both sides that agreed repairs must be performed in a workmanlike manner, and that Arizona law (A.R.S. 32-1121) requires a licensed contractor for corrections and repairs above a set contract price, work that is not of a casual or minor nature, or work that requires a local building permit.

What Buyers Commonly Ask For

In the Valley, the requests I see most often fall into a few groups:

  • Water: active roof leaks, plumbing leaks, water heater problems, drainage toward the foundation
  • Cooling: an AC system that is not keeping up, or one the HVAC technician flags for service
  • Electrical safety: items the inspector flags as safety concerns
  • Pests: treatment for active termites found on the wood-destroying insect report
  • Pool and spa: failed equipment, leaks or barrier gaps

Cosmetic items rarely help a request. Leading with safety and systems keeps the seller focused on what matters.

When the Seller Does Not Answer

Under the standard contract the seller responds in writing within five days, or the number of days the contract sets. The seller's failure to respond in writing within that time is conclusively deemed a refusal to correct or address any of the disapproved items. The buyer then has five days after the seller's response, or after the seller's time runs out, whichever comes first, to cancel and get the earnest money back. If the buyer does not cancel, the buyer closes without the items the seller has not agreed in writing to correct or address.

The contract is blunt about one thing: verbal discussions will not extend these time periods. Only a written agreement signed by both parties will. A friendly phone call with the listing agent is not an extension.

After the Seller Agrees

If the seller agrees in writing to repairs, the seller completes them in a workmanlike manner and delivers paid receipts to the buyer three days before the close of escrow date, unless the contract sets another number. I check those receipts against the BINSR items, then check the work at the walkthrough.

If the seller agrees to address items with a monetary credit or a change in purchase price, the form says an addendum must be submitted to the buyer's lender, who may limit or restrict total contractual credits. I send it to the loan officer right away so it does not surprise anyone at closing. This is general information about a standard form, not legal advice.

Inspection period and contingencies in an Arizona purchase contract

The inspection period gets most of the attention, but it is only one of several contingencies in the standard Arizona resale contract. Each one has its own clock, and a buyer who understands how they overlap is much less likely to miss one.

The inspection period. On the Arizona REALTORS® resale form, the inspection period is ten days after contract acceptance unless the parties write in a different number. During this time the buyer, at the buyer's expense, conducts the physical, environmental and other inspections they want, and can consult government agencies, lenders, insurance agents and other appropriate people about the home and the surrounding area. That second part is easy to overlook: the inspection period is also the time to call an insurance agent and check zoning or permits, not just to hire a home inspector.

The Loan Status Update. Within ten days after contract acceptance, the buyer delivers the AAR Loan Status Update (LSU), which describes where the loan stands. Because this deadline usually falls on or near the last day of a ten-day inspection period, I ask buyers to have their lender working on the LSU from day one.

The appraisal contingency. The sale is contingent on an appraisal acceptable to the lender for at least the purchase price. If the home appraises low, the buyer has five days after notice of the appraised value to cancel and get the earnest money back, or the appraisal contingency is waived. The appraisal often happens after the inspection period ends, so this clock can start late in the process.

The loan contingency. No later than three days before the close of escrow date, the buyer either signs loan documents, delivers notice of loan approval, or delivers notice of inability to obtain loan approval. Not locking the rate with the lender, or not having the needed down payment and other funds, does not count as an unfulfilled loan contingency.

How the deadlines line up on a typical purchase

Here is the order I sketch for buyers on a calendar the day the offer is accepted, using the default terms above. Your own contract may change any of them.

  1. Day of acceptance: the inspection period and LSU clocks both start.
  2. First days: earnest money delivered, inspections booked, insurance quotes started, HOA documents requested.
  3. By the end of the inspection period: BINSR delivered.
  4. By day ten: LSU delivered to the seller.
  5. When the appraisal comes in: if it is low, the five-day appraisal clock starts.
  6. Three days before closing: loan approval notice, loan documents signed, or notice of inability.

Seeing it laid out this way helps buyers understand why I push to schedule inspections in the first two or three days. Every day spent waiting for an inspector is a day taken from the time to decide.

Questions to ask your agent before you sign

  • Is the inspection period the default ten days or something different, and when exactly does it end?
  • Who on my side is responsible for delivering the LSU, and has my lender seen the contract?
  • If the appraisal is low, what are my choices besides cancelling?
  • Have any contingencies been changed or removed by addendum or counteroffer?
  • Which notices have to be in writing, and who do they go to?

I ask these out loud with every buyer, because the answers change from contract to contract. This is general information about a standard form, not legal advice.

My Tips for a Stronger Repair Request

  • Lead with safety, water, roof and major systems, not paint and cabinet knobs.
  • Back up big requests with a licensed contractor's estimate.
  • Think about asking for a credit so you control who does the work (if your lender allows it).
  • If the seller agrees to repairs, ask for paid receipts and check the work at the final walkthrough.

If the seller offers a home warranty, or you are thinking of asking for one in the repair negotiation, read what a home warranty in Arizona is (and isn't) before you count on it. It is a service contract, not a substitute for the inspection.

Once the seller agrees to repairs, you check them at the end. My final walkthrough checklist for Arizona buyers covers matching each repair to its receipt and testing the AC, appliances, irrigation and pool.

When one line in the inspection report needs a second opinion

Suppose the report shows a brown ceiling stain under an upstairs bathroom. The photo tells you where to look. It doesn't tell you whether the tub leaked last week, a supply line is leaking today or someone painted over an old repair. Before deciding what to put on the Buyer's Inspection Notice and Seller's Response (BINSR), ask your inspector what was visible, what was tested and what was outside the inspection.

Give a qualified plumber the page reference, the photo and the location of the bathroom above it. Ask for findings you can act on. Could the plumber reproduce the leak? Was the area accessible? What repair, if any, is recommended? Coordinate permission and access through your agent before anyone opens a wall or ceiling. If the appointment falls outside your contract timeline, ask your agent about your options right away. An appointment on a contractor's calendar is not an agreed extension.

Keep each agreed repair tied to its evidence

On the Arizona REALTORS BINSR form, the seller can agree to correct or address the items the buyer disapproved under the terms of the response and Section 6j of the purchase contract, and the form says agreed repairs must be performed in a workmanlike manner. After both sides sign, keep a copy of the exact wording and make a small file for each item. For the ceiling example, separate the cause of the water from its visible effects. If the agreement covers both, a painter's invoice answers only part of the question.

Read the work description before the final walkthrough. A receipt that says "service call" can be genuine and still leave you unable to tell which bathroom the technician visited. Ask for the location, work performed and completion date while the vendor can still clarify. For anything hidden by the finished repair, ask for photos taken during the work. If the original defect needs a specialist to assess, arrange access for that specialist through your agent.

Bring the original photos back to the walkthrough

Open the inspection photo on your phone at the same spot in the house. Compare the fixture, ceiling bay or panel label, especially where two rooms look alike. Note what you saw yourself and what you still need the contractor to explain. Share any unresolved item with your agent before closing so you can review it against the signed agreement and decide how to proceed.

More questions buyers ask

Can I add items to my BINSR after I send it?
No. The form says all disapproved inspection period items must be in the notice, and the buyer is not entitled to change the election after it is delivered.

What if the seller ignores my BINSR?
Under the standard contract, silence past the response deadline is deemed a refusal. You then have five days to cancel, or you close without those items.

Does the seller have to use a licensed contractor?
The BINSR cites A.R.S. 32-1121, which requires a licensed contractor for repairs above a set contract price, work that is not casual or minor, or work that needs a local building permit.

How long is the inspection period in Arizona?
On the standard resale form it is ten days after contract acceptance unless the parties agree to a different number.

What happens if the home appraises low in Arizona?
Under the standard form, the buyer has five days after notice of the appraised value to cancel and receive the earnest money back, or the appraisal contingency is waived.

Is the loan contingency part of the inspection period?
No. They are separate. The loan contingency runs until three days before closing.

Can I ask the original inspector to look at an agreed repair?
Ask whether the inspector offers a return visit, what it covers and whether a licensed trade is better suited to check the item. Coordinate access and timing as soon as you know what work the seller agreed to do.

How should I document a repair if the wall has already been closed?
Ask the contractor for a written description, photos taken before the wall was closed and any permit or inspection record that applies. Note which part of the agreement each document addresses, and raise any remaining doubt with your agent.

What if the receipt describes a different fixture?
Compare the room, fixture description and photo with the signed response. Send the mismatch to your agent and ask the party who did the work to clarify. A corrected invoice and a return visit answer very different questions.

Ready to Start Looking?

Browse my featured homes, or search by city, like Scottsdale, Phoenix and Gilbert. Moving here from out of state? Start with your first steps to buying a home in the Valley, and see how I help buyers on my buying page.

Want someone watching every deadline for you?
I'll line up inspectors, go over the reports with you and write a BINSR that protects you without souring the deal. Call or text Terry Day at 602-483-4665.

Terry Day, REALTOR®, DeLex Realty, 10115 E Bell Rd, Scottsdale, AZ 85260.